Caltrans: Bishop ADA Project Update 7/19

banner_caltranslogo.png

Here is the weekly update for the Bishop ADA Project:

Updated Information as of Thursday, July 19, 2018

  • Construction work will resume on Sunday evening, July 22, 2018:
    • East side of Main Street (US Hwy 395) at the corner of Jay Street.
    • The south-east corner of Main Street (US Hwy 395) and Line Street (State Route 168).
    • North side of Line Street (State Route 168) between Main Street (US Hwy 395) and Warren Street.
  • All construction work will take place from 7:00 pm to 6:00 am the next morning, Sunday evening through Friday morning only. No Construction on Friday or Saturday nights.
  • Traffic will encounter lane closures with a detour around the construction area.
  • Work consists of removing concrete sidewalks, curbs, and driveways and replacing with ADA (Americans with Disabilities Act) compliant sidewalks, curbs, and driveways.